September 22, 2022
1 min read

NASA troubleshoots leak issue of Artemis I

The launch director confirmed all objectives have been met for the cryogenic demonstration test, and teams proceeded with critical preparations for draining the rocket’s tanks…reports Asian Lite News

The US space agency has once again readied its Artemis I moon mission and met all objectives, including the key hydrogen leak threat which has resulted in two failure attempts.

After encountering a hydrogen leak early in the loading process with the Space Launch System (SLS), engineers were able to troubleshoot the issue and proceed with the planned activities, NASA said in a statement.

The four main objectives for the demonstration included assessing the repair to address the hydrogen leak identified on the previous launch attempt, loading propellants into the rocket’s tanks using new procedures, conducting the kick-start bleed, and performing a pre-pressurisation test.

“The liquid hydrogen leak remains manageable during the Artemis I cryogenic demonstration test. Teams warmed up the quick disconnect umbilical line and the leak then maxed out at 3.4 per cent, which is within the acceptable range to continue,” NASA said in a tweet.

The launch director confirmed all objectives have been met for the cryogenic demonstration test, and teams proceeded with critical preparations for draining the rocket’s tanks.

Teams will now evaluate the data from the test, along with weather and other factors, before confirming readiness to proceed into the next launch opportunity.

“The rocket remains in a safe configuration as teams assess next steps,” said NASA.

NASA will attempt to launch its Artemis I moon mission on September 27, with a potential backup opportunity of October 2 under review.

On September 3, NASA attempted to launch Artemis I but called it off after detecting a liquid hydrogen leak.

The US space agency on August 30 scrubbed the mission launch for the first time owing to technical glitch with one of the SLS rocket’s engines.

Artemis I is NASA’s uncrewed flight test which will provide a foundation for human exploration in deep space and demonstrate NASA’s commitment and capability to extend human existence to the Moon and beyond.

ALSO READ: NASA’s Moon mission pushed back, again

Previous Story

Haley slams govt for letting Raisi speak at UN 

Next Story

TV channels chief medium of hate speech, says SC

Latest from USA

India Rejects Trump Mediation

He reaffirmed India’s openness to dialogue, but underscored that any talks must be grounded in seriousness and a clear commitment to ending cross-border terrorism In a firm rebuttal to former U.S. President

Trump: No Place for Radicalism in US

Israeli Ambassador to the UN Danny Danon labelled the fatal attack a “depraved act of anti-Semitic terrorism”…reports Asian Lite News US President Donald Trump strongly condemned the shooting that killed two Israeli

Nvidia slams US chip export curbs as ‘failure’

Jensen Huang said the US move has backfired by accelerating China’s self-sufficiency in semiconductors and diminishing American dominance in the global chip market…reports Asian Lite News Nvidia CEO Jensen Huang has sharply

Trump’s $175B Dome Plan

The ambitious system is designed to create a comprehensive network of satellites capable of detecting, tracking, and intercepting incoming missiles….reports Asian Lite News US President Donald Trump announced Tuesday a $175 billion
Go toTop

Don't Miss

Republicans fuel migrant fears with bogus cat-eating tale

Immigration is seen as a critical issue in a nail-biter

China’s opposition to audit of labs dangerous, says White House

“Their position is irresponsible and frankly dangerous … It’s not