September 12, 2023
1 min read

Al Maktoum Solar Park Targets 6.4M Tonnes Carbon Cuts

Saeed Mohammed Al Tayer, MD and CEO of DEWA, explained that the Mohammed bin Rashid Al Maktoum Solar Park will reduce around 6.424 million tonnes of carbon emissions annually after commissioning the 6th phase in 2026…reports Asian Lite News

Dubai Electricity and Water Authority (DEWA) continues to enhance sustainability and support the transition towards a sustainable green economy by increasing the share of clean and renewable energy in Dubai’s energy mix.

This supports the Year of Sustainability in the UAE, during which the country will host the Conference of the Parties to the United Nations Framework Convention on Climate Change (COP28).

Earlier this year, DEWA inaugurated the 900 megawatts (MW) fifth phase of the Mohammed bin Rashid Al Maktoum Solar Park, the largest single-site solar park in the world, using the Independent Power Producer (IPP) model, with total investments of over AED 2 billion. DEWA has also signed an agreement with Abu Dhabi Future Energy Company (Masdar), to build and operate the 1,800 MW sixth phase of the solar park, with investments of up to AED 5.51 billion.

Saeed Mohammed Al Tayer, MD and CEO of DEWA, explained that the Mohammed bin Rashid Al Maktoum Solar Park will reduce around 6.424 million tonnes of carbon emissions annually after commissioning the 6th phase in 2026.

“DEWA supports the UAE’s efforts to reach Net-Zero by 2050 and realise the Dubai Clean Energy Strategy 2050 and the Dubai Net Zero Carbon Emissions Strategy 2050, to provide 100% of Dubai’s total power capacity from clean energy sources by 2050. To achieve this goal, we continue to implement the Mohammed bin Rashid Al Maktoum Solar Park projects as per the timeline. The total capacity of the solar energy projects commissioned at the solar park has reached 2,427MW, which is 16.3% of the total installed capacity in Dubai.”

Al Tayer added that this percentage will reach 24% in 2026 after completing the Fourth and Sixth phases. The solar park has a planned production capacity of 5,000 MW by 2030 using solar photovoltaic panels and concentrated solar power with total investments of AED50 billion. When completed, the solar park will reduce over 6.5 million tonnes of carbon emissions annually.

ALSO READ-Saudi tops Dubai Chamber’s export destinations in H1

Previous Story

Dubai Chamber Expands Reach With 20+ Biz Councils

Next Story

UAE, Philippines Explore Trade, Investment Ties

Latest from -Top News

‘UAE leads global fight against plastic waste’

UAE accelerates its fight against plastic pollution with a bold single-use plastic ban and expanded environmental policies to safeguard natural ecosystems for future generations The United Arab Emirates continues to lead the

70,000 Gaza kids starve

WFP warned that any further escalation of conflict could paralyse relief operations altogether, deepening the plight of civilians—especially children, the elderly, and vulnerable groups As the humanitarian crisis in Gaza intensifies, the

Prayers on the Mount

The Day of Arafat, considered the pinnacle of the Hajj pilgrimage, witnessed a congregation of believers from around the world As the sun blazed overhead and temperatures climbed to a sweltering 41°C,

EID MUBARAK!

UAE marks Eid Al Adha with housing support, children’s gifts, pardons, and cultural celebrations, reflecting a national spirit of compassion, unity, and shared community values Across the UAE, Eid Al Adha is

Trump Bans Travel from 12 Nations

The 12 countries that were banned include Afghanistan, Burma, Chad, Congo, Equatorial Guinea, Eritrea, Haiti, Iran, Libya, Somalia, Sudan, and Yemen….reports Asian Lite News US President Donald Trump has signed a proclamation
Go toTop

Don't Miss

DEWA raises Dh22 bn in biggest Gulf IPO

A total of 9 billion ordinary shares, representing 18% of

DEWA, TRANSCO to increase UAE’s water security

The move reinforces a shared national goal for creating strategic