April 13, 2023
2 mins read

Rashid Rover ready to touch down on April 25

The Rashid Rover is currently orbiting the Moon at an altitude of about 100 km at the perilune (periapsis) and about 2,300 km at the apolune (apoapsis)….reports Asian Lite News

The Mohammed Bin Rashid Space Centre (MBRSC) announced that the Rashid Rover, onboard the HAKUTO-R Mission 1 Lunar Lander, is scheduled to land on the Moon on 25th April 2023 at 8:40 PM (UAE time).

The landing date is subject to change depending on operational conditions. The Rashid Rover is currently orbiting the Moon at an altitude of about 100 km at the perilune (periapsis) and about 2,300 km at the apolune (apoapsis). The points in the orbit that is closest to the centre of the moon are called perilune, and the farthest is known as apolune.

At around 7:40 PM on 25th April, the lander carrying Rashid Rover will perform multiple orbital control manoeuvrers to reach a 100 km circular orbit around the Moon before initiating the landing sequence. During the landing sequence, the lander will perform a braking burn, firing its main propulsion system to decelerate from orbit. Utilising a series of pre-set commands, the lander will adjust its altitude and reduce velocity to make a soft landing on the confirmed site of Atlas Crater in the Mare Frigoris.

The ELM team will complete close to a total 370 minutes of communication with the world’s most compact rover before landing, along with 12 mission rehearsals for surface operations. The mission rehearsal is crucial for the engineering team to be prepared and ready with their programmes for execution post the lunar landing and also enable the different teams on the subsystems to sync their operational work.

The next stage of navigation for HAKUTO-R Mission 1 lunar lander that holds the Rashid Rover includes the completion of all planned lunar orbital control manoeuvrers before the landing sequence as well as confirm that the lander is ready to start the landing sequence. In case of any changes in operational conditions, three alternative landing sites, with the next landing opportunities set for 26th April, 1st and 3rd May, have also been scheduled.

The Emirates Lunar Mission is funded by the ICT Fund of the Telecommunications and Digital Government Regulatory Authority (TDRA) which aims to support research and development in the ICT sector in the UAE.

ALSO READ: Sheikh Mohamed bin Zayed, Sisi review regional developments

Previous Story

Al Jaber seeks ‘fundamental reform’ of IFIs, MDBs

Next Story

Intel leak complicates summit with S Korea

Previous Story

Al Jaber seeks ‘fundamental reform’ of IFIs, MDBs

Next Story

Intel leak complicates summit with S Korea

Latest from -Top News

Canada, India ties improving at rapid pace: Report

Business Council of Canada says trade negotiations are nearing completion, with Modi’s expected December visit offering a potential milestone for stronger economic ties…reports Asian Lite News Desk Relations between Canada and India

UK firms land £330m Africa deals

British exporters are set to benefit from more than £330 million in contracts for schools, water, electricity and government infrastructure projects in Guinea and Benin…reports Africa Daily News Desk British businesses are

India, US Push for Early Trade Deal

Rubio and Jaishankar discuss trade, defence, technology and energy security during talks in Mumbai as both sides seek an early agreement…reports Asian Lite News India and the United States have reaffirmed their
Go toTop

Don't Miss

MBZ, Czech leader discuss bilateral ties

The two leaders discussed the existing ties between the UAE

Sheikh Abdullah dials Lapid after Israel visit

The trip is Sheikh Abdullah’s second visit to Israel since