April 13, 2023
2 mins read

Rashid Rover ready to touch down on April 25

The Rashid Rover is currently orbiting the Moon at an altitude of about 100 km at the perilune (periapsis) and about 2,300 km at the apolune (apoapsis)….reports Asian Lite News

The Mohammed Bin Rashid Space Centre (MBRSC) announced that the Rashid Rover, onboard the HAKUTO-R Mission 1 Lunar Lander, is scheduled to land on the Moon on 25th April 2023 at 8:40 PM (UAE time).

The landing date is subject to change depending on operational conditions. The Rashid Rover is currently orbiting the Moon at an altitude of about 100 km at the perilune (periapsis) and about 2,300 km at the apolune (apoapsis). The points in the orbit that is closest to the centre of the moon are called perilune, and the farthest is known as apolune.

At around 7:40 PM on 25th April, the lander carrying Rashid Rover will perform multiple orbital control manoeuvrers to reach a 100 km circular orbit around the Moon before initiating the landing sequence. During the landing sequence, the lander will perform a braking burn, firing its main propulsion system to decelerate from orbit. Utilising a series of pre-set commands, the lander will adjust its altitude and reduce velocity to make a soft landing on the confirmed site of Atlas Crater in the Mare Frigoris.

The ELM team will complete close to a total 370 minutes of communication with the world’s most compact rover before landing, along with 12 mission rehearsals for surface operations. The mission rehearsal is crucial for the engineering team to be prepared and ready with their programmes for execution post the lunar landing and also enable the different teams on the subsystems to sync their operational work.

The next stage of navigation for HAKUTO-R Mission 1 lunar lander that holds the Rashid Rover includes the completion of all planned lunar orbital control manoeuvrers before the landing sequence as well as confirm that the lander is ready to start the landing sequence. In case of any changes in operational conditions, three alternative landing sites, with the next landing opportunities set for 26th April, 1st and 3rd May, have also been scheduled.

The Emirates Lunar Mission is funded by the ICT Fund of the Telecommunications and Digital Government Regulatory Authority (TDRA) which aims to support research and development in the ICT sector in the UAE.

ALSO READ: Sheikh Mohamed bin Zayed, Sisi review regional developments

Previous Story

Al Jaber seeks ‘fundamental reform’ of IFIs, MDBs

Next Story

Intel leak complicates summit with S Korea

Latest from -Top News

Mass Expulsions Close Afghan Shops in Pakistan

As Pakistan intensifies its mass deportation drive against Afghan refugees, the once-bustling Afghan-owned businesses in Rawalpindi are falling silent. With the March 31 deadline for repatriation passed, a growing number of Afghan-run

South Korea Sets June 3 Presidential Election

South Korea will hold a presidential election on June 3, the government confirmed on Tuesday, setting the stage for a new leadership following the impeachment and removal of former President Yoon Suk

RPP Rallies for Return of Nepal’s Monarchy

Police on alert as royalist rallies return to the capital Kathmandu witnessed heightened tensions on Tuesday as the pro-monarchy Rastriya Prajatantra Party (RPP) staged a high-profile demonstration demanding the reinstatement of Nepal’s
Go toTop

Don't Miss

UAE’s ‘Jahiz’ among top 9 future resilience pioneers

The “Jahiz” initiative, a national digital platform for empowering federal

Al Dhafra Festival Set To Kick Off October 21

The festival comes as a continuation of the efforts of