July 29, 2022
1 min read

No power shortage in country, parliament told

Centre announced its decision to abrogate the so-called special status of J&K and divided it into two Union Territories — has become a history in ‘Naya Jammu and Kashmir’…reports Asian Lite News

The government on Thursday told the Lok Sabha that there is no power shortage in the country.

In a written reply, Power Minister R.K. Singh said: “At present, there is adequate installed capacity for power generation in the country as on June 30, the installed generation capacity of India was 403.76 Giga Watt (GW) which is sufficient to meet the Peak Power Demand of the country of around 215.89 Giga Watt (GW) which had occurred in the month of April, 2022 during the current year 2022-23.”

He said that the Centre had launched Ujwal DISCOM Assurance Yojana (UDAY) in November, 2015 with the objective of financial and operational turnaround of the State owned Power Distribution Companies (DISCOMs), wherein one of the operational parameters to be targetted was reduction in gap between Average Cost of Supply (ACS) and Average Revenue Realised (ARR) to zero.

To bring reforms in Distribution Sector, the Central Government has launched a new Reforms-based and Results-linked, Revamped Distribution Sector Scheme (RDSS) in July 2021 with the objective of improving the quality and reliability of power supply to consumers through a financially sustainable and operationally efficient Distribution Sector in the country.

Meanwhile, the electricity crisis in the Himalayan region, which was a norm till August 5, 2019 — when the Centre announced its decision to abrogate the so-called special status of J&K and divided it into two Union Territories — has become a history in ‘Naya Jammu and Kashmir’.

Recently, the Union Power Ministry sanctioned a phase-I package of Rs 5641.91 crore for complete revamping of the power distribution infrastructure under Revamped Distribution Sector Scheme (RDSS) in both urban and rural areas of J&K. Of the sanctioned amount under Phase-I, Jammu Power Development Corporation Limited will get Rs 2807.70 crore and Kashmir Power Development Corporation Limited will receive Rs 2834.21 crore to undertake the works that remained stuck in one or other wrangle for seven decades.

ALSO READ-India grapples with power crisis as coal prices surge

Previous Story

Maldives Prez to visit India from August 1

Next Story

478 tech snags reported in planes in one year: Ministry

Latest from India News

Bhutan King Takes Holy Dip at Maha Kumbh

So far, around 35 crore devotees have taken a holy dip at the Triveni Sangam….reports Asian Lite News Bhutan’s King Jigme Khesar Namgyel Wangchuck participated in the Maha Kumbh festivities in Prayagraj

Modi Set for White House Visit

The invitation comes days after a recent phone call between the two leaders on January 27…reports Asian Lite News Prime Minister Narendra Modi is set to visit the White House next week

UNGA President Lands in India for Key Talks

UNGA President Philemon Yang to visit India Feb 4-8 at India’s invitation….reports Asian Lite News United Nations General Assembly (UNGA) President Philemon Yang is set to embark on an official visit to
Go toTop

Don't Miss

Deuba govt recommends new envoy to India

The post in the New Delhi embassy of Nepal fell

What Digital India means for Indian retail investors

The ‘WealthDesk Year-end Bulletin’ underscored that the country has made