July 29, 2022
1 min read

No power shortage in country, parliament told

Centre announced its decision to abrogate the so-called special status of J&K and divided it into two Union Territories — has become a history in ‘Naya Jammu and Kashmir’…reports Asian Lite News

The government on Thursday told the Lok Sabha that there is no power shortage in the country.

In a written reply, Power Minister R.K. Singh said: “At present, there is adequate installed capacity for power generation in the country as on June 30, the installed generation capacity of India was 403.76 Giga Watt (GW) which is sufficient to meet the Peak Power Demand of the country of around 215.89 Giga Watt (GW) which had occurred in the month of April, 2022 during the current year 2022-23.”

He said that the Centre had launched Ujwal DISCOM Assurance Yojana (UDAY) in November, 2015 with the objective of financial and operational turnaround of the State owned Power Distribution Companies (DISCOMs), wherein one of the operational parameters to be targetted was reduction in gap between Average Cost of Supply (ACS) and Average Revenue Realised (ARR) to zero.

To bring reforms in Distribution Sector, the Central Government has launched a new Reforms-based and Results-linked, Revamped Distribution Sector Scheme (RDSS) in July 2021 with the objective of improving the quality and reliability of power supply to consumers through a financially sustainable and operationally efficient Distribution Sector in the country.

Meanwhile, the electricity crisis in the Himalayan region, which was a norm till August 5, 2019 — when the Centre announced its decision to abrogate the so-called special status of J&K and divided it into two Union Territories — has become a history in ‘Naya Jammu and Kashmir’.

Recently, the Union Power Ministry sanctioned a phase-I package of Rs 5641.91 crore for complete revamping of the power distribution infrastructure under Revamped Distribution Sector Scheme (RDSS) in both urban and rural areas of J&K. Of the sanctioned amount under Phase-I, Jammu Power Development Corporation Limited will get Rs 2807.70 crore and Kashmir Power Development Corporation Limited will receive Rs 2834.21 crore to undertake the works that remained stuck in one or other wrangle for seven decades.

ALSO READ-India grapples with power crisis as coal prices surge

Previous Story

Maldives Prez to visit India from August 1

Next Story

478 tech snags reported in planes in one year: Ministry

Latest from India News

Kiwis Soar to Final, India Awaits 

Ravindra, Williamson power NZ to record total as Miller’s blazing ton goes in vain.  Former winner New Zealand set up a meeting with India in the final of the 2025 Champions Trophy

Mamata to Address Oxford, Meet UK Industrialists 

The topic of Banerjee’s Oxford address remains undisclosed. She was invited in 2021, but Trinamool Congress claimed central government interference led to its cancellation.  West Bengal Chief Minister Mamata Banerjee is set

Epic Unveiling 

The highly anticipated teaser for Kannappa, an epic film based on the legendary tale, was launched at a media event in Mumbai. Bollywood actor Akshay Kumar, lead actor Vishnu Manchu, and director
Go toTop

Don't Miss

India, Pakistan Attend Meeting on Indus Waters Treaty

India’s delegation for the meeting was led by the Department

India gets historic maiden titles as Dipika returns

Dipika and Joshna are Commonwealth Games winners in women’s doubles